🇦🇫 Afghanistan: compute potential
Afghanistan sits on a resource ceiling of roughly 66 GW, worth $3.9T to $5.2T of AI compute at today's prices, about 262 times its $20B GDP. The bankable slice today is $222B, which is $4,922 for every citizen, discounted mainly for stability and chip access. It has built 0.5% of the ceiling and runs about 1 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 262 times the economy, and the readiness gap is the to-do list.
🇧🇩 Bangladesh: compute potential
Bangladesh sits on a resource ceiling of roughly 6 GW, worth $360B to $480B of AI compute at today's prices, about 1 times its $458B GDP. The bankable slice today is $41B, which is $230 for every citizen, discounted mainly for governance and momentum. It has built 3.8% of the ceiling and runs about 40 MW of live datacenter capacity, a Gross Domestic Compute of $2B. A long road: the ceiling is modest next to the economy, and the option still costs nothing to hold.
🇧🇹 Bhutan: compute potential
Bhutan sits on a resource ceiling of roughly 31 GW, worth $1.9T to $2.5T of AI compute at today's prices, about 836 times its $3B GDP. The bankable slice today is $326B, which is $407,132 for every citizen, discounted mainly for capital markets and fiber. It has built 11.2% of the ceiling and runs about 5 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇮🇳 India: compute potential
India sits on a resource ceiling of roughly 271 GW, worth $16.3T to $21.7T of AI compute at today's prices, about 6 times its $3,916B GDP. The bankable slice today is $1.7T, which is $1,180 for every citizen, discounted mainly for physical conditions and governance. It has built 20.3% of the ceiling and runs 1.9 GW of live datacenter capacity, a Gross Domestic Compute of $95B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇳🇵 Nepal: compute potential
Nepal sits on a resource ceiling of roughly 88 GW, worth $5.3T to $7.1T of AI compute at today's prices, about 157 times its $45B GDP. The bankable slice today is $535B, which is $17,820 for every citizen, discounted mainly for governance and capital markets. It has built 3.9% of the ceiling and runs about 10 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 157 times the economy, and the readiness gap is the to-do list.
🇵🇰 Pakistan: compute potential
Pakistan sits on a resource ceiling of roughly 114 GW, worth $6.8T to $9.1T of AI compute at today's prices, about 22 times its $408B GDP. The bankable slice today is $587B, which is $2,267 for every citizen, discounted mainly for the grid and governance. It has built 9.3% of the ceiling and runs about 1 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 22 times the economy, and the readiness gap is the to-do list.
🇱🇰 Sri Lanka: compute potential
Sri Lanka sits on a resource ceiling of roughly 14 GW, worth $858B to $1.1T of AI compute at today's prices, about 10 times its $109B GDP. The bankable slice today is $108B, which is $4,683 for every citizen, discounted mainly for capital markets and momentum. It has built 9.8% of the ceiling and runs about 30 MW of live datacenter capacity, a Gross Domestic Compute of $2B. Emerging upside: a narrower gap, and a real one.
🇦🇲 Armenia: compute potential
Armenia sits on a resource ceiling of roughly 4 GW, worth $242B to $323B of AI compute at today's prices, about 11 times its $29B GDP. The bankable slice today is $18B, which is $6,379 for every citizen, discounted mainly for capital markets and governance. It has built 33.9% of the ceiling and runs about 30 MW of live datacenter capacity, a Gross Domestic Compute of $2B. Emerging upside: a narrower gap, and a real one.
🇦🇿 Azerbaijan: compute potential
Azerbaijan sits on a resource ceiling of roughly 15 GW, worth $884B to $1.2T of AI compute at today's prices, about 16 times its $76B GDP. The bankable slice today is $118B, which is $11,226 for every citizen, discounted mainly for governance and capital markets. It has built 9.0% of the ceiling and runs about 1 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. Emerging upside: a narrower gap, and a real one.
🇬🇪 Georgia: compute potential
Georgia sits on a resource ceiling of roughly 16 GW, worth $984B to $1.3T of AI compute at today's prices, about 34 times its $38B GDP. The bankable slice today is $95B, which is $24,992 for every citizen, discounted mainly for capital markets and governance. It has built 21.4% of the ceiling and runs about 20 MW of live datacenter capacity, a Gross Domestic Compute of $1B. A sleeping giant: the endowment runs 34 times the economy, and the readiness gap is the to-do list.
🇰🇿 Kazakhstan: compute potential
Kazakhstan sits on a resource ceiling of roughly 80 GW, worth $4.8T to $6.4T of AI compute at today's prices, about 21 times its $303B GDP. The bankable slice today is $911B, which is $43,401 for every citizen, discounted mainly for governance and capital markets. It has built 4.0% of the ceiling and runs about 100 MW of live datacenter capacity, a Gross Domestic Compute of $5B. A sleeping giant: the endowment runs 21 times the economy, and the readiness gap is the to-do list.
🇰🇬 Kyrgyzstan: compute potential
Kyrgyzstan sits on a resource ceiling of roughly 40 GW, worth $2.4T to $3.2T of AI compute at today's prices, about 146 times its $22B GDP. The bankable slice today is $214B, which is $28,878 for every citizen, discounted mainly for the grid and governance. It has built 10.2% of the ceiling and runs about 5 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 146 times the economy, and the readiness gap is the to-do list.
🇹🇯 Tajikistan: compute potential
Tajikistan sits on a resource ceiling of roughly 65 GW, worth $3.9T to $5.2T of AI compute at today's prices, about 289 times its $18B GDP. The bankable slice today is $314B, which is $28,546 for every citizen, discounted mainly for governance and the grid. It has built 9.1% of the ceiling and runs about 5 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 289 times the economy, and the readiness gap is the to-do list.
🇹🇲 Turkmenistan: compute potential
Turkmenistan sits on a resource ceiling of roughly 35 GW, worth $2.1T to $2.8T of AI compute at today's prices, about 36 times its $77B GDP. The bankable slice today is $339B, which is $43,966 for every citizen, discounted mainly for governance and fiber. It has built 0.0% of the ceiling and runs about 2 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 36 times the economy, and the readiness gap is the to-do list.
🇺🇿 Uzbekistan: compute potential
Uzbekistan sits on a resource ceiling of roughly 34 GW, worth $2.0T to $2.7T of AI compute at today's prices, about 18 times its $147B GDP. The bankable slice today is $261B, which is $6,864 for every citizen, discounted mainly for governance and capital markets. It has built 6.8% of the ceiling and runs about 6 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 18 times the economy, and the readiness gap is the to-do list.
🇨🇳 China: compute potential
China sits on a resource ceiling of roughly 744 GW, worth $44.7T to $59.6T of AI compute at today's prices, about 3 times its $19,626B GDP. The bankable slice today is $2.7T, which is $1,941 for every citizen, discounted mainly for chip access and governance. It has built 50.6% of the ceiling and runs 23.0 GW of live datacenter capacity, a Gross Domestic Compute of $1.1T. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇯🇵 Japan: compute potential
Japan sits on a resource ceiling of roughly 62 GW, worth $3.7T to $4.9T of AI compute at today's prices, about 1 times its $4,435B GDP. The bankable slice today is $1.0T, which is $8,553 for every citizen, discounted mainly for physical conditions and governance. It has built 38.2% of the ceiling and runs 2.0 GW of live datacenter capacity, a Gross Domestic Compute of $100B. An incumbent: already priced in, already building.
🇲🇳 Mongolia: compute potential
Mongolia sits on a resource ceiling of roughly 89 GW, worth $5.4T to $7.1T of AI compute at today's prices, about 286 times its $25B GDP. The bankable slice today is $724B, which is $201,128 for every citizen, discounted mainly for fiber and momentum. It has built 0.0% of the ceiling and runs about 10 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 286 times the economy, and the readiness gap is the to-do list.
🇰🇷 South Korea: compute potential
South Korea sits on a resource ceiling of roughly 14 GW, worth $840B to $1.1T of AI compute at today's prices, about 1 times its $1,872B GDP. The bankable slice today is $172B, which is $3,304 for every citizen, discounted mainly for governance and stability. It has built 12.9% of the ceiling and runs about 800 MW of live datacenter capacity, a Gross Domestic Compute of $40B. An incumbent: already priced in, already building.
🇹🇼 Taiwan: compute potential
Taiwan sits on a resource ceiling of roughly 16 GW, worth $943B to $1.3T of AI compute at today's prices, about 1 times its $920B GDP. The bankable slice today is $153B, which is $6,660 for every citizen, discounted mainly for physical conditions and stability. It has built 29.9% of the ceiling and runs about 450 MW of live datacenter capacity, a Gross Domestic Compute of $22B. An incumbent: already priced in, already building.
🇰🇭 Cambodia: compute potential
Cambodia sits on a resource ceiling of roughly 16 GW, worth $980B to $1.3T of AI compute at today's prices, about 27 times its $49B GDP. The bankable slice today is $96B, which is $5,333 for every citizen, discounted mainly for governance and momentum. It has built 8.0% of the ceiling and runs about 20 MW of live datacenter capacity, a Gross Domestic Compute of $1B. A sleeping giant: the endowment runs 27 times the economy, and the readiness gap is the to-do list.
🇮🇩 Indonesia: compute potential
Indonesia sits on a resource ceiling of roughly 137 GW, worth $8.2T to $10.9T of AI compute at today's prices, about 8 times its $1,446B GDP. The bankable slice today is $1.5T, which is $5,107 for every citizen, discounted mainly for governance and physical conditions. It has built 6.8% of the ceiling and runs about 400 MW of live datacenter capacity, a Gross Domestic Compute of $20B. Emerging upside: a narrower gap, and a real one.
🇱🇦 Laos: compute potential
Laos sits on a resource ceiling of roughly 31 GW, worth $1.8T to $2.5T of AI compute at today's prices, about 137 times its $18B GDP. The bankable slice today is $180B, which is $22,481 for every citizen, discounted mainly for capital markets and governance. It has built 31.8% of the ceiling and runs about 5 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 137 times the economy, and the readiness gap is the to-do list.
🇲🇾 Malaysia: compute potential
Malaysia sits on a resource ceiling of roughly 19 GW, worth $1.1T to $1.5T of AI compute at today's prices, about 3 times its $472B GDP. The bankable slice today is $105B, which is $2,926 for every citizen, discounted mainly for physical conditions and governance. It has built 32.2% of the ceiling and runs 1.5 GW of live datacenter capacity, a Gross Domestic Compute of $75B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇲🇲 Myanmar: compute potential
Myanmar sits on a resource ceiling of roughly 124 GW, worth $7.4T to $9.9T of AI compute at today's prices, about 121 times its $82B GDP. The bankable slice today is $296B, which is $5,375 for every citizen, discounted mainly for stability and governance. It has built 2.7% of the ceiling and runs about 5 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 121 times the economy, and the readiness gap is the to-do list.
🇵🇬 Papua New Guinea: compute potential
Papua New Guinea sits on a resource ceiling of roughly 34 GW, worth $2.1T to $2.7T of AI compute at today's prices, about 86 times its $32B GDP. The bankable slice today is $281B, which is $25,545 for every citizen, discounted mainly for the grid and governance. It has built 0.9% of the ceiling and runs about 5 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 86 times the economy, and the readiness gap is the to-do list.
🇵🇭 Philippines: compute potential
Philippines sits on a resource ceiling of roughly 38 GW, worth $2.3T to $3.0T of AI compute at today's prices, about 6 times its $487B GDP. The bankable slice today is $275B, which is $2,330 for every citizen, discounted mainly for governance and physical conditions. It has built 18.9% of the ceiling and runs about 100 MW of live datacenter capacity, a Gross Domestic Compute of $5B. Emerging upside: a narrower gap, and a real one.
🇸🇬 Singapore: compute potential
Singapore sits on a resource ceiling of roughly 0 GW, worth $0B to $0B of AI compute at today's prices, about 0 times its $604B GDP. The bankable slice today is $0B, which is $12 for every citizen, discounted mainly for physical conditions and governance. It has built 0.0% of the ceiling and runs 1.1 GW of live datacenter capacity, a Gross Domestic Compute of $55B. An incumbent: already priced in, already building.
🇹🇭 Thailand: compute potential
Thailand sits on a resource ceiling of roughly 25 GW, worth $1.5T to $2.0T of AI compute at today's prices, about 4 times its $577B GDP. The bankable slice today is $195B, which is $2,711 for every citizen, discounted mainly for governance and physical conditions. It has built 16.4% of the ceiling and runs about 200 MW of live datacenter capacity, a Gross Domestic Compute of $10B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇻🇳 Vietnam: compute potential
Vietnam sits on a resource ceiling of roughly 48 GW, worth $2.9T to $3.8T of AI compute at today's prices, about 8 times its $494B GDP. The bankable slice today is $186B, which is $1,827 for every citizen, discounted mainly for governance and physical conditions. It has built 48.3% of the ceiling and runs about 150 MW of live datacenter capacity, a Gross Domestic Compute of $8B. Emerging upside: a narrower gap, and a real one.
🇩🇿 Algeria: compute potential
Algeria sits on a resource ceiling of roughly 130 GW, worth $7.8T to $10.4T of AI compute at today's prices, about 36 times its $286B GDP. The bankable slice today is $1.1T, which is $23,205 for every citizen, discounted mainly for capital markets and momentum. It has built 0.2% of the ceiling and runs about 30 MW of live datacenter capacity, a Gross Domestic Compute of $2B. A sleeping giant: the endowment runs 36 times the economy, and the readiness gap is the to-do list.
🇪🇬 Egypt: compute potential
Egypt sits on a resource ceiling of roughly 64 GW, worth $3.8T to $5.1T of AI compute at today's prices, about 14 times its $365B GDP. The bankable slice today is $535B, which is $4,455 for every citizen, discounted mainly for governance and capital markets. It has built 4.4% of the ceiling and runs about 80 MW of live datacenter capacity, a Gross Domestic Compute of $4B. A sleeping giant: the endowment runs 14 times the economy, and the readiness gap is the to-do list.
🇮🇷 Iran: compute potential
Iran sits on a resource ceiling of roughly 123 GW, worth $7.4T to $9.8T of AI compute at today's prices, about 26 times its $371B GDP. The bankable slice today is $588B, which is $6,317 for every citizen, discounted mainly for chip access and governance. It has built 10.6% of the ceiling and runs about 50 MW of live datacenter capacity, a Gross Domestic Compute of $2B. A sleeping giant: the endowment runs 26 times the economy, and the readiness gap is the to-do list.
🇮🇶 Iraq: compute potential
Iraq sits on a resource ceiling of roughly 36 GW, worth $2.2T to $2.9T of AI compute at today's prices, about 11 times its $264B GDP. The bankable slice today is $253B, which is $5,275 for every citizen, discounted mainly for the grid and capital markets. It has built 7.0% of the ceiling and runs about 20 MW of live datacenter capacity, a Gross Domestic Compute of $1B. A sleeping giant: the endowment runs 11 times the economy, and the readiness gap is the to-do list.
🇮🇱 Israel: compute potential
Israel sits on a resource ceiling of roughly 1 GW, worth $66B to $88B of AI compute at today's prices, about 0 times its $611B GDP. The bankable slice today is $13B, which is $1,373 for every citizen, discounted mainly for physical conditions and governance. It has built 0.0% of the ceiling and runs about 300 MW of live datacenter capacity, a Gross Domestic Compute of $15B. An incumbent: already priced in, already building.
🇯🇴 Jordan: compute potential
Jordan sits on a resource ceiling of roughly 14 GW, worth $868B to $1.2T of AI compute at today's prices, about 19 times its $62B GDP. The bankable slice today is $144B, which is $12,036 for every citizen, discounted mainly for capital markets and governance. It has built 0.0% of the ceiling and runs about 30 MW of live datacenter capacity, a Gross Domestic Compute of $2B. Emerging upside: a narrower gap, and a real one.
🇰🇼 Kuwait: compute potential
Kuwait sits on a resource ceiling of roughly 11 GW, worth $653B to $871B of AI compute at today's prices, about 6 times its $158B GDP. The bankable slice today is $279B, which is $54,757 for every citizen, discounted mainly for physical conditions and governance. It has built 0.0% of the ceiling and runs about 50 MW of live datacenter capacity, a Gross Domestic Compute of $2B. Emerging upside: a narrower gap, and a real one.
🇱🇾 Libya: compute potential
Libya sits on a resource ceiling of roughly 98 GW, worth $5.9T to $7.8T of AI compute at today's prices, about 174 times its $45B GDP. The bankable slice today is $413B, which is $55,094 for every citizen, discounted mainly for stability and governance. It has built 0.0% of the ceiling and runs about 5 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 174 times the economy, and the readiness gap is the to-do list.
🇲🇦 Morocco: compute potential
Morocco sits on a resource ceiling of roughly 35 GW, worth $2.1T to $2.8T of AI compute at today's prices, about 15 times its $183B GDP. The bankable slice today is $328B, which is $8,405 for every citizen, discounted mainly for governance and capital markets. It has built 5.2% of the ceiling and runs about 40 MW of live datacenter capacity, a Gross Domestic Compute of $2B. A sleeping giant: the endowment runs 15 times the economy, and the readiness gap is the to-do list.
🇴🇲 Oman: compute potential
Oman sits on a resource ceiling of roughly 36 GW, worth $2.1T to $2.8T of AI compute at today's prices, about 27 times its $106B GDP. The bankable slice today is $608B, which is $106,690 for every citizen, discounted mainly for physical conditions and governance. It has built 0.0% of the ceiling and runs about 50 MW of live datacenter capacity, a Gross Domestic Compute of $2B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇶🇦 Qatar: compute potential
Qatar sits on a resource ceiling of roughly 11 GW, worth $635B to $846B of AI compute at today's prices, about 4 times its $221B GDP. The bankable slice today is $344B, which is $107,650 for every citizen, discounted mainly for physical conditions and governance. It has built 0.0% of the ceiling and runs about 80 MW of live datacenter capacity, a Gross Domestic Compute of $4B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇸🇦 Saudi Arabia: compute potential
Saudi Arabia sits on a resource ceiling of roughly 128 GW, worth $7.6T to $10.2T of AI compute at today's prices, about 8 times its $1,277B GDP. The bankable slice today is $1.6T, which is $46,563 for every citizen, discounted mainly for physical conditions and governance. It has built 0.0% of the ceiling and runs about 300 MW of live datacenter capacity, a Gross Domestic Compute of $15B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇹🇷 Turkey: compute potential
Turkey sits on a resource ceiling of roughly 97 GW, worth $5.8T to $7.7T of AI compute at today's prices, about 5 times its $1,597B GDP. The bankable slice today is $566B, which is $6,436 for every citizen, discounted mainly for governance and physical conditions. It has built 36.0% of the ceiling and runs about 200 MW of live datacenter capacity, a Gross Domestic Compute of $10B. Emerging upside: a narrower gap, and a real one.
🇦🇪 UAE: compute potential
UAE sits on a resource ceiling of roughly 14 GW, worth $851B to $1.1T of AI compute at today's prices, about 2 times its $572B GDP. The bankable slice today is $406B, which is $33,842 for every citizen, discounted mainly for physical conditions and governance. It has built 0.0% of the ceiling and runs about 600 MW of live datacenter capacity, a Gross Domestic Compute of $30B. An incumbent: already priced in, already building.
🇦🇴 Angola: compute potential
Angola sits on a resource ceiling of roughly 90 GW, worth $5.4T to $7.2T of AI compute at today's prices, about 51 times its $142B GDP. The bankable slice today is $704B, which is $17,589 for every citizen, discounted mainly for the grid and capital markets. It has built 4.3% of the ceiling and runs about 20 MW of live datacenter capacity, a Gross Domestic Compute of $1B. A sleeping giant: the endowment runs 51 times the economy, and the readiness gap is the to-do list.
🇧🇼 Botswana: compute potential
Botswana sits on a resource ceiling of roughly 29 GW, worth $1.7T to $2.3T of AI compute at today's prices, about 116 times its $20B GDP. The bankable slice today is $284B, which is $109,112 for every citizen, discounted mainly for momentum and capital markets. It has built 0.0% of the ceiling and runs about 10 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇨🇲 Cameroon: compute potential
Cameroon sits on a resource ceiling of roughly 32 GW, worth $2.0T to $2.6T of AI compute at today's prices, about 44 times its $59B GDP. The bankable slice today is $174B, which is $5,599 for every citizen, discounted mainly for the grid and capital markets. It has built 3.4% of the ceiling and runs about 5 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 44 times the economy, and the readiness gap is the to-do list.
🇨🇩 DR Congo: compute potential
DR Congo sits on a resource ceiling of roughly 147 GW, worth $8.8T to $11.8T of AI compute at today's prices, about 126 times its $93B GDP. The bankable slice today is $703B, which is $6,064 for every citizen, discounted mainly for governance and capital markets. It has built 1.8% of the ceiling and runs about 5 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 126 times the economy, and the readiness gap is the to-do list.
🇪🇹 Ethiopia: compute potential
Ethiopia sits on a resource ceiling of roughly 115 GW, worth $6.9T to $9.2T of AI compute at today's prices, about 85 times its $109B GDP. The bankable slice today is $826B, which is $5,945 for every citizen, discounted mainly for capital markets and fiber. It has built 8.7% of the ceiling and runs about 20 MW of live datacenter capacity, a Gross Domestic Compute of $1B. A sleeping giant: the endowment runs 85 times the economy, and the readiness gap is the to-do list.
🇬🇭 Ghana: compute potential
Ghana sits on a resource ceiling of roughly 11 GW, worth $651B to $868B of AI compute at today's prices, about 8 times its $115B GDP. The bankable slice today is $81B, which is $2,246 for every citizen, discounted mainly for capital markets and governance. It has built 13.8% of the ceiling and runs about 30 MW of live datacenter capacity, a Gross Domestic Compute of $2B. Emerging upside: a narrower gap, and a real one.
🇬🇳 Guinea: compute potential
Guinea sits on a resource ceiling of roughly 15 GW, worth $876B to $1.2T of AI compute at today's prices, about 43 times its $27B GDP. The bankable slice today is $66B, which is $4,432 for every citizen, discounted mainly for the grid and capital markets. It has built 7.5% of the ceiling and runs about 2 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. Emerging upside: a narrower gap, and a real one.
🇰🇪 Kenya: compute potential
Kenya sits on a resource ceiling of roughly 43 GW, worth $2.6T to $3.5T of AI compute at today's prices, about 26 times its $136B GDP. The bankable slice today is $533B, which is $9,037 for every citizen, discounted mainly for capital markets and governance. It has built 4.2% of the ceiling and runs about 60 MW of live datacenter capacity, a Gross Domestic Compute of $3B. A sleeping giant: the endowment runs 26 times the economy, and the readiness gap is the to-do list.
🇲🇬 Madagascar: compute potential
Madagascar sits on a resource ceiling of roughly 85 GW, worth $5.1T to $6.8T of AI compute at today's prices, about 340 times its $20B GDP. The bankable slice today is $529B, which is $15,565 for every citizen, discounted mainly for governance and the grid. It has built 0.2% of the ceiling and runs about 5 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 340 times the economy, and the readiness gap is the to-do list.
🇲🇿 Mozambique: compute potential
Mozambique sits on a resource ceiling of roughly 62 GW, worth $3.7T to $5.0T of AI compute at today's prices, about 226 times its $22B GDP. The bankable slice today is $507B, which is $13,713 for every citizen, discounted mainly for capital markets and governance. It has built 3.6% of the ceiling and runs about 5 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 226 times the economy, and the readiness gap is the to-do list.
🇳🇦 Namibia: compute potential
Namibia sits on a resource ceiling of roughly 63 GW, worth $3.8T to $5.0T of AI compute at today's prices, about 334 times its $15B GDP. The bankable slice today is $776B, which is $242,383 for every citizen, discounted mainly for momentum and governance. It has built 0.6% of the ceiling and runs about 10 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 334 times the economy, and the readiness gap is the to-do list.
🇳🇬 Nigeria: compute potential
Nigeria sits on a resource ceiling of roughly 57 GW, worth $3.4T to $4.6T of AI compute at today's prices, about 16 times its $290B GDP. The bankable slice today is $517B, which is $2,135 for every citizen, discounted mainly for the grid and governance. It has built 4.0% of the ceiling and runs about 100 MW of live datacenter capacity, a Gross Domestic Compute of $5B. A sleeping giant: the endowment runs 16 times the economy, and the readiness gap is the to-do list.
🇷🇼 Rwanda: compute potential
Rwanda sits on a resource ceiling of roughly 1 GW, worth $62B to $82B of AI compute at today's prices, about 5 times its $16B GDP. The bankable slice today is $8B, which is $510 for every citizen, discounted mainly for capital markets and governance. It has built 9.7% of the ceiling and runs about 10 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. Emerging upside: a narrower gap, and a real one.
🇿🇦 South Africa: compute potential
South Africa sits on a resource ceiling of roughly 75 GW, worth $4.5T to $6.0T of AI compute at today's prices, about 14 times its $427B GDP. The bankable slice today is $660B, which is $10,158 for every citizen, discounted mainly for the grid and governance. It has built 4.7% of the ceiling and runs about 350 MW of live datacenter capacity, a Gross Domestic Compute of $18B. A sleeping giant: the endowment runs 14 times the economy, and the readiness gap is the to-do list.
🇸🇩 Sudan: compute potential
Sudan sits on a resource ceiling of roughly 109 GW, worth $6.5T to $8.7T of AI compute at today's prices, about 218 times its $40B GDP. The bankable slice today is $369B, which is $6,969 for every citizen, discounted mainly for stability and governance. It has built 1.5% of the ceiling and runs about 2 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 218 times the economy, and the readiness gap is the to-do list.
🇹🇿 Tanzania: compute potential
Tanzania sits on a resource ceiling of roughly 48 GW, worth $2.9T to $3.9T of AI compute at today's prices, about 45 times its $87B GDP. The bankable slice today is $526B, which is $7,208 for every citizen, discounted mainly for capital markets and governance. It has built 5.6% of the ceiling and runs about 20 MW of live datacenter capacity, a Gross Domestic Compute of $1B. A sleeping giant: the endowment runs 45 times the economy, and the readiness gap is the to-do list.
🇺🇬 Uganda: compute potential
Uganda sits on a resource ceiling of roughly 13 GW, worth $776B to $1.0T of AI compute at today's prices, about 16 times its $66B GDP. The bankable slice today is $70B, which is $1,311 for every citizen, discounted mainly for governance and capital markets. It has built 16.3% of the ceiling and runs about 10 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. Emerging upside: a narrower gap, and a real one.
🇿🇲 Zambia: compute potential
Zambia sits on a resource ceiling of roughly 44 GW, worth $2.6T to $3.5T of AI compute at today's prices, about 120 times its $29B GDP. The bankable slice today is $296B, which is $12,851 for every citizen, discounted mainly for capital markets and the grid. It has built 7.2% of the ceiling and runs about 10 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 120 times the economy, and the readiness gap is the to-do list.
🇿🇼 Zimbabwe: compute potential
Zimbabwe sits on a resource ceiling of roughly 24 GW, worth $1.4T to $1.9T of AI compute at today's prices, about 36 times its $53B GDP. The bankable slice today is $130B, which is $7,672 for every citizen, discounted mainly for capital markets and governance. It has built 4.7% of the ceiling and runs about 10 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 36 times the economy, and the readiness gap is the to-do list.
🇦🇱 Albania: compute potential
Albania sits on a resource ceiling of roughly 5 GW, worth $323B to $431B of AI compute at today's prices, about 14 times its $30B GDP. The bankable slice today is $13B, which is $4,818 for every citizen, discounted mainly for momentum and capital markets. It has built 46.6% of the ceiling and runs about 5 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. Emerging upside: a narrower gap, and a real one.
🇦🇹 Austria: compute potential
Austria sits on a resource ceiling of roughly 16 GW, worth $938B to $1.2T of AI compute at today's prices, about 2 times its $580B GDP. The bankable slice today is $30B, which is $3,335 for every citizen, discounted mainly for governance and physical conditions. It has built 76.1% of the ceiling and runs about 150 MW of live datacenter capacity, a Gross Domestic Compute of $8B. An incumbent: already priced in, already building.
🇧🇦 Bosnia & Herzegovina: compute potential
Bosnia & Herzegovina sits on a resource ceiling of roughly 7 GW, worth $428B to $571B of AI compute at today's prices, about 17 times its $33B GDP. The bankable slice today is $26B, which is $8,259 for every citizen, discounted mainly for momentum and capital markets. It has built 31.7% of the ceiling and runs about 5 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. Emerging upside: a narrower gap, and a real one.
🇧🇬 Bulgaria: compute potential
Bulgaria sits on a resource ceiling of roughly 6 GW, worth $373B to $497B of AI compute at today's prices, about 4 times its $131B GDP. The bankable slice today is $31B, which is $4,576 for every citizen, discounted mainly for governance and capital markets. It has built 54.7% of the ceiling and runs about 50 MW of live datacenter capacity, a Gross Domestic Compute of $2B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇨🇿 Czechia: compute potential
Czechia sits on a resource ceiling of roughly 2 GW, worth $125B to $167B of AI compute at today's prices, about 0 times its $389B GDP. The bankable slice today is $10B, which is $887 for every citizen, discounted mainly for governance and capital markets. It has built 52.6% of the ceiling and runs about 100 MW of live datacenter capacity, a Gross Domestic Compute of $5B. An incumbent: already priced in, already building.
🇩🇰 Denmark: compute potential
Denmark sits on a resource ceiling of roughly 10 GW, worth $619B to $826B of AI compute at today's prices, about 2 times its $462B GDP. The bankable slice today is $173B, which is $28,829 for every citizen, discounted mainly for capital markets and governance. It has built 0.0% of the ceiling and runs about 400 MW of live datacenter capacity, a Gross Domestic Compute of $20B. An incumbent: already priced in, already building.
🇫🇮 Finland: compute potential
Finland sits on a resource ceiling of roughly 16 GW, worth $962B to $1.3T of AI compute at today's prices, about 4 times its $317B GDP. The bankable slice today is $206B, which is $36,727 for every citizen, discounted mainly for capital markets and governance. It has built 20.0% of the ceiling and runs about 400 MW of live datacenter capacity, a Gross Domestic Compute of $20B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇫🇷 France: compute potential
France sits on a resource ceiling of roughly 35 GW, worth $2.1T to $2.8T of AI compute at today's prices, about 1 times its $3,369B GDP. The bankable slice today is $414B, which is $6,182 for every citizen, discounted mainly for stability and governance. It has built 56.9% of the ceiling and runs 1.0 GW of live datacenter capacity, a Gross Domestic Compute of $50B. An incumbent: already priced in, already building.
🇩🇪 Germany: compute potential
Germany sits on a resource ceiling of roughly 27 GW, worth $1.6T to $2.2T of AI compute at today's prices, about 0 times its $5,048B GDP. The bankable slice today is $197B, which is $2,340 for every citizen, discounted mainly for physical conditions and governance. It has built 51.5% of the ceiling and runs 3.0 GW of live datacenter capacity, a Gross Domestic Compute of $150B. An incumbent: already priced in, already building.
🇬🇷 Greece: compute potential
Greece sits on a resource ceiling of roughly 19 GW, worth $1.1T to $1.5T of AI compute at today's prices, about 6 times its $280B GDP. The bankable slice today is $183B, which is $18,522 for every citizen, discounted mainly for governance and physical conditions. It has built 17.8% of the ceiling and runs about 100 MW of live datacenter capacity, a Gross Domestic Compute of $5B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇮🇸 Iceland: compute potential
Iceland sits on a resource ceiling of roughly 21 GW, worth $1.3T to $1.7T of AI compute at today's prices, about 43 times its $39B GDP. The bankable slice today is $324B, which is $809,948 for every citizen, discounted mainly for capital markets and governance. It has built 14.7% of the ceiling and runs about 100 MW of live datacenter capacity, a Gross Domestic Compute of $5B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇮🇪 Ireland: compute potential
Ireland sits on a resource ceiling of roughly 12 GW, worth $692B to $922B of AI compute at today's prices, about 1 times its $718B GDP. The bankable slice today is $177B, which is $32,783 for every citizen, discounted mainly for governance and capital markets. It has built 4.3% of the ceiling and runs 1.3 GW of live datacenter capacity, a Gross Domestic Compute of $65B. An incumbent: already priced in, already building.
🇮🇹 Italy: compute potential
Italy sits on a resource ceiling of roughly 38 GW, worth $2.3T to $3.0T of AI compute at today's prices, about 1 times its $2,550B GDP. The bankable slice today is $179B, which is $3,031 for every citizen, discounted mainly for governance and physical conditions. It has built 61.0% of the ceiling and runs about 400 MW of live datacenter capacity, a Gross Domestic Compute of $20B. An incumbent: already priced in, already building.
🇳🇱 Netherlands: compute potential
Netherlands sits on a resource ceiling of roughly 10 GW, worth $619B to $825B of AI compute at today's prices, about 1 times its $1,332B GDP. The bankable slice today is $170B, which is $9,429 for every citizen, discounted mainly for governance and capital markets. It has built 0.0% of the ceiling and runs 1.1 GW of live datacenter capacity, a Gross Domestic Compute of $55B. An incumbent: already priced in, already building.
🇳🇴 Norway: compute potential
Norway sits on a resource ceiling of roughly 53 GW, worth $3.2T to $4.2T of AI compute at today's prices, about 8 times its $531B GDP. The bankable slice today is $297B, which is $52,118 for every citizen, discounted mainly for governance and capital markets. It has built 64.1% of the ceiling and runs about 300 MW of live datacenter capacity, a Gross Domestic Compute of $15B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇵🇱 Poland: compute potential
Poland sits on a resource ceiling of roughly 15 GW, worth $891B to $1.2T of AI compute at today's prices, about 1 times its $1,036B GDP. The bankable slice today is $180B, which is $4,729 for every citizen, discounted mainly for governance and capital markets. It has built 6.7% of the ceiling and runs about 200 MW of live datacenter capacity, a Gross Domestic Compute of $10B. An incumbent: already priced in, already building.
🇵🇹 Portugal: compute potential
Portugal sits on a resource ceiling of roughly 21 GW, worth $1.3T to $1.7T of AI compute at today's prices, about 5 times its $346B GDP. The bankable slice today is $197B, which is $19,733 for every citizen, discounted mainly for governance and physical conditions. It has built 33.0% of the ceiling and runs about 100 MW of live datacenter capacity, a Gross Domestic Compute of $5B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇷🇴 Romania: compute potential
Romania sits on a resource ceiling of roughly 27 GW, worth $1.6T to $2.1T of AI compute at today's prices, about 5 times its $428B GDP. The bankable slice today is $190B, which is $10,003 for every citizen, discounted mainly for governance and capital markets. It has built 24.7% of the ceiling and runs about 80 MW of live datacenter capacity, a Gross Domestic Compute of $4B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇷🇺 Russia: compute potential
Russia sits on a resource ceiling of roughly 731 GW, worth $43.8T to $58.5T of AI compute at today's prices, about 23 times its $2,588B GDP. The bankable slice today is $2.7T, which is $18,900 for every citizen, discounted mainly for chip access and governance. It has built 7.4% of the ceiling and runs about 600 MW of live datacenter capacity, a Gross Domestic Compute of $30B. A sleeping giant: the endowment runs 23 times the economy, and the readiness gap is the to-do list.
🇷🇸 Serbia: compute potential
Serbia sits on a resource ceiling of roughly 8 GW, worth $466B to $621B of AI compute at today's prices, about 6 times its $100B GDP. The bankable slice today is $25B, which is $3,750 for every citizen, discounted mainly for governance and capital markets. It has built 48.4% of the ceiling and runs about 30 MW of live datacenter capacity, a Gross Domestic Compute of $2B. Emerging upside: a narrower gap, and a real one.
🇪🇸 Spain: compute potential
Spain sits on a resource ceiling of roughly 52 GW, worth $3.1T to $4.1T of AI compute at today's prices, about 2 times its $1,904B GDP. The bankable slice today is $363B, which is $7,566 for every citizen, discounted mainly for governance and physical conditions. It has built 44.5% of the ceiling and runs about 400 MW of live datacenter capacity, a Gross Domestic Compute of $20B. An incumbent: already priced in, already building.
🇸🇪 Sweden: compute potential
Sweden sits on a resource ceiling of roughly 34 GW, worth $2.0T to $2.7T of AI compute at today's prices, about 4 times its $669B GDP. The bankable slice today is $339B, which is $30,784 for every citizen, discounted mainly for governance and capital markets. It has built 48.6% of the ceiling and runs about 500 MW of live datacenter capacity, a Gross Domestic Compute of $25B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇨🇭 Switzerland: compute potential
Switzerland sits on a resource ceiling of roughly 20 GW, worth $1.2T to $1.6T of AI compute at today's prices, about 2 times its $1,044B GDP. The bankable slice today is $25B, which is $2,792 for every citizen, discounted mainly for physical conditions and governance. It has built 88.6% of the ceiling and runs about 300 MW of live datacenter capacity, a Gross Domestic Compute of $15B. An incumbent: already priced in, already building.
🇺🇦 Ukraine: compute potential
Ukraine sits on a resource ceiling of roughly 27 GW, worth $1.6T to $2.2T of AI compute at today's prices, about 10 times its $213B GDP. The bankable slice today is $148B, which is $3,693 for every citizen, discounted mainly for stability and capital markets. It has built 17.3% of the ceiling and runs about 50 MW of live datacenter capacity, a Gross Domestic Compute of $2B. A sleeping giant: the endowment runs 10 times the economy, and the readiness gap is the to-do list.
🇬🇧 United Kingdom: compute potential
United Kingdom sits on a resource ceiling of roughly 15 GW, worth $890B to $1.2T of AI compute at today's prices, about 0 times its $4,003B GDP. The bankable slice today is $200B, which is $2,851 for every citizen, discounted mainly for governance and capital markets. It has built 12.8% of the ceiling and runs 2.6 GW of live datacenter capacity, a Gross Domestic Compute of $130B. An incumbent: already priced in, already building.
🇦🇷 Argentina: compute potential
Argentina sits on a resource ceiling of roughly 214 GW, worth $12.8T to $17.1T of AI compute at today's prices, about 25 times its $681B GDP. The bankable slice today is $1.9T, which is $42,370 for every citizen, discounted mainly for capital markets and governance. It has built 5.2% of the ceiling and runs about 70 MW of live datacenter capacity, a Gross Domestic Compute of $4B. A sleeping giant: the endowment runs 25 times the economy, and the readiness gap is the to-do list.
🇧🇴 Bolivia: compute potential
Bolivia sits on a resource ceiling of roughly 95 GW, worth $5.7T to $7.6T of AI compute at today's prices, about 119 times its $64B GDP. The bankable slice today is $636B, which is $48,908 for every citizen, discounted mainly for governance and capital markets. It has built 0.8% of the ceiling and runs about 5 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 119 times the economy, and the readiness gap is the to-do list.
🇧🇷 Brazil: compute potential
Brazil sits on a resource ceiling of roughly 484 GW, worth $29.0T to $38.7T of AI compute at today's prices, about 17 times its $2,280B GDP. The bankable slice today is $3.8T, which is $17,728 for every citizen, discounted mainly for governance and capital markets. It has built 22.7% of the ceiling and runs about 900 MW of live datacenter capacity, a Gross Domestic Compute of $45B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇨🇦 Canada: compute potential
Canada sits on a resource ceiling of roughly 458 GW, worth $27.5T to $36.6T of AI compute at today's prices, about 16 times its $2,320B GDP. The bankable slice today is $4.5T, which is $113,226 for every citizen, discounted mainly for governance and capital markets. It has built 18.6% of the ceiling and runs 1.4 GW of live datacenter capacity, a Gross Domestic Compute of $70B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇨🇱 Chile: compute potential
Chile sits on a resource ceiling of roughly 66 GW, worth $3.9T to $5.3T of AI compute at today's prices, about 15 times its $355B GDP. The bankable slice today is $711B, which is $35,538 for every citizen, discounted mainly for physical conditions and governance. It has built 11.6% of the ceiling and runs about 300 MW of live datacenter capacity, a Gross Domestic Compute of $15B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇨🇴 Colombia: compute potential
Colombia sits on a resource ceiling of roughly 89 GW, worth $5.3T to $7.1T of AI compute at today's prices, about 16 times its $457B GDP. The bankable slice today is $618B, which is $11,440 for every citizen, discounted mainly for governance and capital markets. It has built 14.6% of the ceiling and runs about 150 MW of live datacenter capacity, a Gross Domestic Compute of $8B. A sleeping giant: the endowment runs 16 times the economy, and the readiness gap is the to-do list.
🇨🇷 Costa Rica: compute potential
Costa Rica sits on a resource ceiling of roughly 15 GW, worth $901B to $1.2T of AI compute at today's prices, about 12 times its $103B GDP. The bankable slice today is $148B, which is $28,536 for every citizen, discounted mainly for capital markets and governance. It has built 17.7% of the ceiling and runs about 50 MW of live datacenter capacity, a Gross Domestic Compute of $2B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇪🇨 Ecuador: compute potential
Ecuador sits on a resource ceiling of roughly 50 GW, worth $3.0T to $4.0T of AI compute at today's prices, about 31 times its $130B GDP. The bankable slice today is $363B, which is $20,178 for every citizen, discounted mainly for the grid and capital markets. It has built 10.4% of the ceiling and runs about 20 MW of live datacenter capacity, a Gross Domestic Compute of $1B. A sleeping giant: the endowment runs 31 times the economy, and the readiness gap is the to-do list.
🇬🇹 Guatemala: compute potential
Guatemala sits on a resource ceiling of roughly 10 GW, worth $607B to $809B of AI compute at today's prices, about 7 times its $121B GDP. The bankable slice today is $60B, which is $3,181 for every citizen, discounted mainly for governance and momentum. It has built 15.3% of the ceiling and runs about 20 MW of live datacenter capacity, a Gross Domestic Compute of $1B. Emerging upside: a narrower gap, and a real one.
🇬🇾 Guyana: compute potential
Guyana sits on a resource ceiling of roughly 21 GW, worth $1.3T to $1.7T of AI compute at today's prices, about 63 times its $27B GDP. The bankable slice today is $261B, which is $325,929 for every citizen, discounted mainly for capital markets and the grid. It has built 0.0% of the ceiling and runs about 5 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 63 times the economy, and the readiness gap is the to-do list.
🇲🇽 Mexico: compute potential
Mexico sits on a resource ceiling of roughly 136 GW, worth $8.1T to $10.9T of AI compute at today's prices, about 6 times its $1,833B GDP. The bankable slice today is $1.4T, which is $10,385 for every citizen, discounted mainly for governance and physical conditions. It has built 10.0% of the ceiling and runs about 400 MW of live datacenter capacity, a Gross Domestic Compute of $20B. Emerging upside: a narrower gap, and a real one.
🇵🇦 Panama: compute potential
Panama sits on a resource ceiling of roughly 5 GW, worth $301B to $401B of AI compute at today's prices, about 4 times its $90B GDP. The bankable slice today is $21B, which is $4,525 for every citizen, discounted mainly for governance and physical conditions. It has built 35.9% of the ceiling and runs about 60 MW of live datacenter capacity, a Gross Domestic Compute of $3B. Emerging upside: a narrower gap, and a real one.
🇵🇾 Paraguay: compute potential
Paraguay sits on a resource ceiling of roughly 25 GW, worth $1.5T to $2.0T of AI compute at today's prices, about 40 times its $49B GDP. The bankable slice today is $183B, which is $25,787 for every citizen, discounted mainly for governance and capital markets. It has built 35.6% of the ceiling and runs about 10 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. A sleeping giant: the endowment runs 40 times the economy, and the readiness gap is the to-do list.
🇵🇪 Peru: compute potential
Peru sits on a resource ceiling of roughly 146 GW, worth $8.7T to $11.7T of AI compute at today's prices, about 34 times its $341B GDP. The bankable slice today is $1.1T, which is $31,221 for every citizen, discounted mainly for governance and stability. It has built 3.8% of the ceiling and runs about 50 MW of live datacenter capacity, a Gross Domestic Compute of $2B. A sleeping giant: the endowment runs 34 times the economy, and the readiness gap is the to-do list.
🇸🇷 Suriname: compute potential
Suriname sits on a resource ceiling of roughly 6 GW, worth $347B to $462B of AI compute at today's prices, about 92 times its $5B GDP. The bankable slice today is $37B, which is $61,700 for every citizen, discounted mainly for capital markets and fiber. It has built 3.3% of the ceiling and runs about 2 MW of live datacenter capacity, a Gross Domestic Compute of under $1B. Emerging upside: a narrower gap, and a real one.
🇺🇸 United States: compute potential
United States sits on a resource ceiling of roughly 571 GW, worth $34.3T to $45.7T of AI compute at today's prices, about 2 times its $30,767B GDP. The bankable slice today is $6.4T, which is $18,286 for every citizen, discounted mainly for physical conditions and governance. It has built 18.7% of the ceiling and runs 41.0 GW of live datacenter capacity, a Gross Domestic Compute of $2.0T. An incumbent: already priced in, already building.
🇺🇾 Uruguay: compute potential
Uruguay sits on a resource ceiling of roughly 18 GW, worth $1.1T to $1.5T of AI compute at today's prices, about 17 times its $86B GDP. The bankable slice today is $214B, which is $62,862 for every citizen, discounted mainly for capital markets and fiber. It has built 8.3% of the ceiling and runs about 50 MW of live datacenter capacity, a Gross Domestic Compute of $2B. Primed: readiness clears 65 percent, and there is real headroom left to build.
🇻🇪 Venezuela: compute potential
Venezuela sits on a resource ceiling of roughly 72 GW, worth $4.3T to $5.8T of AI compute at today's prices, about 58 times its $100B GDP. The bankable slice today is $238B, which is $8,202 for every citizen, discounted mainly for governance and stability. It has built 25.0% of the ceiling and runs about 20 MW of live datacenter capacity, a Gross Domestic Compute of $1B. A sleeping giant: the endowment runs 58 times the economy, and the readiness gap is the to-do list.